CASE STUDIES

Chiller plant & HVAC optimization case studies

Explore Exergenics chilled water plant optimization projects across Australia and the United States, spanning aviation, hospitality, healthcare, higher education and commercial real estate, with 5.3% to 33.4% measured and verified savings per IPMVP Option B.

5–20%
Typical plant energy savings
$0
New hardware or capital spend
2
Countries with verified deployments: Australia and the US
6
Sites with measured results below
OUR RESULTS

Measured and verified energy savings

Each project used a calibrated digital twin of the plant, built from the building management system's own data. Exergenics then issued optimized setpoints, and the site's existing controls contractor implemented them in that same BMS. No new hardware. No new operators to train. Results are confirmed through measurement and verification (M&V), and each case study names any third party that verified them.

From Sydney Airport's international terminal, which handled 17.17 million passengers in 2025, to a live cancer center, the sites below span aviation, hospitality, healthcare, higher education and commercial real estate. Open any case study for the full methodology, the site's before-and-after numbers, and the carbon factor and tariff behind each figure.

CASE STUDIES

Explore verified results by site

How to read the cards. Efficiency improvement is the change in chiller plant efficiency (kW/TR or COP) against the site's adjusted baseline. Energy saving is the reduction in measured chiller plant energy (kWh) against a baseline adjusted for cooling load and weather. Each case study states its measurement period, carbon factor and tariff.

Ready to see what your plant could save?

Start with a feasibility analysis from your own BMS data. No hardware, no disruption, savings estimated before you commit.

Book a feasibility call