Services / Lifetime Emissions

Simulation study, priced per study

Lifetime Emissions: Operational and Refrigerant Carbon for Every Plant Scenario

Operational and refrigerant emissions over the life of the plant, in tCO₂e, for every operating and retrofit scenario, with future energy price, grid intensity and carbon price run as distributions. For decarbonization and reporting decisions.

CALIBRATED TWINCT-1CT-2CT-3CONDENSER WATERChiller 1Chiller 2Chiller 3kWr, kWkWr, kWkWr, kWCHILLED WATERFIELD DEMAND, kWr1Physics engine2Machine learning3Optimization4M&V baselineWET BULB, °C
20 years
of emissions projected for every operating and retrofit scenario.
tCO₂e
operational and refrigerant, over the life of the plant, against agreed grid factors, with a marginal abatement cost per option.
3
inputs run as distributions: future energy price, grid intensity and carbon price.
1,377
tCO₂e avoided per year at Sydney Airport Terminal 1, annualized from nine months of data, verified to IPMVP Option B. Delivered with A.G. Coombs.
Answers
What the emissions look like over twenty years
Output
Operational and refrigerant tCO₂e over the life of the plant, and marginal abatement cost per option
Covers
Operating and retrofit scenarios, including refrigerant
Priced
Per study, scoped from the same model
On this page
What’s includedUncertainty shownVerified abatementFAQ

What’s included

Lifetime Emissions is built for decarbonization and reporting decisions, from the same calibrated model that runs every other Exergenics service.

Operational and refrigerant tCO₂e

Across operating and retrofit scenarios, against agreed grid factors.

Marginal abatement cost per option

Including refrigerant emissions and low-GWP trade-offs.

Uncertainty shown, not hidden

Future energy price, grid intensity and carbon price are run as distributions rather than single assumptions, so every scenario carries its range as well as its central estimate.

Verified abatement from optimization

Where controls optimization is deployed, annual tCO₂e avoided is measured to IPMVP Option B and suitable for sustainability reporting.

Site
Plant energy
Carbon avoided, p.a.
Sydney Airport, Terminal 1
33.4%
1,377 tCO₂e
Hotel and casino, Australia
12.3%
561 tCO₂e
Office tower, Sydney
10.4%
118.4 tCO₂e
Stadium, Los Angeles
7.2%
98 tCO₂e

Verified reduction against a weather and load adjusted baseline. Read the case studies

Frequently asked questions

Are refrigerant emissions included?

Yes. The marginal abatement cost per option includes refrigerant emissions and low-GWP trade-offs.

Which grid factors do you use?

Operational and refrigerant tCO₂e over the life of the plant is calculated against agreed grid factors, with future grid intensity run as a distribution.

How is it priced?

Per study, scoped from the same calibrated model. Contact us to scope one.

Related services

Start with a Feasibility Study

A desktop forecast from your plant’s own BMS data: data gap analysis, a plant health check and a Plant Potential business case.

Priced per ton (TR) of installed capacity. Request a price list