Measurement and Verification to IPMVP Option B, Included as Standard

Savings quantified to IPMVP Option B, included as standard. The deployed strategy is checked remotely against the BMS record, and drift is flagged without a site visit.

CALIBRATED TWINCT-1CT-2CT-3CONDENSER WATERChiller 1Chiller 2Chiller 3kWr, kWkWr, kWkWr, kWCHILLED WATERFIELD DEMAND, kWr1Physics engine2Machine learning3Predictive control4M&V baselineWET BULB, °C
5–35%
less chilled water plant energy. Published engagements sit between 6.8% and 33.4%, each measured to IPMVP Option B.
10–15%
peak demand reduction, from staging on field demand rather than on chiller loading.
~18 mo
average payback. The full range across published sites is 6–24 months.
None
new hardware, new technicians or new software on site. Your incumbent controls contractor implements.
Protocol
IPMVP Option B, Retrofit Isolation
Calibration
ASHRAE Guideline 14
Timing
Month 12, then every year after
Available
Included in Full Optimisation, or standalone
On this page
Energy baselineRemote controls validationMechanical baselinesDegradation monitoringWhen it happensWhat to trend and keepFAQ

A plant energy baseline you can defend

Every engagement builds a plant energy baseline model valid for M&V to IPMVP Option B, Retrofit Isolation, calibrated to ASHRAE Guideline 14. Every savings forecast is tested against it after twelve months.

Verification is twelve months of metered energy against the weather and load adjusted baseline, suitable for reporting and utility submission. With legacy optimisation, M&V is third-party billable, if it is done at all. Here it is included as standard.

Remote controls validation

After your incumbent contractor implements the functional description, remote witnessing confirms the plant is running the strategy as written. From then on, the deployed strategy is checked remotely against the BMS record, and drift is flagged without a site visit.

Exergenics does not write to the BMS and does not connect to plant control. All work is remote and air-gapped.

Mechanical baselines

Equipment performance models

Chiller, pump and cooling tower performance models built from the site’s own trend data.

Mechanical baselines

Runtime per cycle, cycles per day and short-cycling ratio, reported alongside energy.

Equipment degradation monitoring

Where API integration exists, the model also tracks:

Chiller COP degradation
Cooling tower heat rejection degradation
Pump efficiency degradation

When it happens

When
Step
What happens
Implementation
Remote witnessing
Confirms the plant is running the strategy as written.
Week 52
Measurement and verification
Twelve months of metered energy against the adjusted baseline, to IPMVP Option B.
Ongoing
Continuous commissioning
Model tuning as the plant and its use change. Drift flagged remotely. Savings verified against the baseline every year.

Frequently asked questions

Can we buy M&V on its own?

Yes. Measurement and Verification is available standalone, or each year after the first year included in Full Optimisation.

How are savings verified?

Against a weather and load adjusted baseline, to IPMVP Option B, Retrofit Isolation, with the baseline calibrated to ASHRAE Guideline 14.

What trend data must we keep?

Chiller optimisation points at 15-minute intervals or better, retained for at least three years.

Related services

Start with a Feasibility Study

A desktop forecast from your plant’s own BMS data: data gap analysis, a plant health check and a Plant Potential business case. Credited in full against any option purchased within 90 days.

Priced per kilowatt of refrigeration (kWr) of installed plant capacity. Request a price list