FREE WHITE PAPER · 8 MIN READ

Is your building optimization ready?

Seven years of chilled water plant optimization, distilled into the four things that decide whether an optimization engine starts saving energy on day one, or spends three months learning your building first.

FREE PDF WHITE PAPER

Download the white paper

A facility manager's guide to preparing your chilled water plant for AI-driven optimization, plus the 15-point readiness checklist.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Free · No spam · Instant access

TRUSTED BY LEADING COMMERCIAL AND INSTITUTIONAL FACILITIES
Sydney Airport
CBRE
Leading Universities
Stockland
AMP
CSIRO
THE SHIFT
Your plant data stopped being disposable

Most building management systems were configured to hold a couple of days of trend data. Every optimization tool arriving on the market runs on the same fuel: accurate, historical operating data — and the buildings quietly keeping it are about to have a significant head start.

60–90
The old model
Install a box on site, then wait a full quarter while it works out how the plant behaves. Savings start after the learning period, not before.
Day one
The new model
Hold a solid history of good-quality data and the optimization engine is trained on it before deployment. It goes live already knowing your plant.
95%
Already optimization ready
If you're already trending accurate historical data and storing it somewhere sensible, you're roughly 95% of the way to being optimization ready.
THE FRAMEWORK
The four pillars of optimization readiness

The first three are within reach of almost any building, with the systems you already have plus minor investment in metering and storage. The fourth matters at portfolio scale and is a nice to have, not a blocker.

01
Documentation
Functional descriptions, as-built schematics and equipment schedules go missing with every upgrade. Protecting them costs nothing: it is discipline, not capital.
02
Infrastructure & metering
Chillers are around 70% of plant energy, yet chiller power often isn't trended. Exposing power points you already own is the cheapest data upgrade in the room.
03
Data trending & storage
Which points to capture, in what order, at what resolution, and for how long. The paper gives the full hierarchy: energy, speeds, temperatures, flow.
04
Portfolio data strategy (Optional)
Centralize across sites via an FDD platform or your own data lake. A valuable accelerant at portfolio scale, but not a prerequisite for getting started.

Is your building optimization ready?

WHITE PAPER
WHAT'S INSIDE
Twelve pages, written engineer to engineer
No marketing layer. Specific points, specific resolutions, specific retention periods, and a self-assessment you can run against your own building this afternoon.
01.
03.
05.
07.
09.
11.
Why your plant data suddenly matters
Protecting the paper trail
The 70% you can't afford to guess at
Turning your BMS into a historian
Resolution, duration and partial data
Savings from day one
02.
04.
06.
08.
10.
12.
The four pillars of readiness
VSDs without a power point
Calibration: the upgrade with two payoffs
How to identify a high-value point
Centralize, but don't wait
The 15-point readiness checklist

Stop leaving savings on the floor.

Get the technical guide and see exactly where conventional
control strategies fall short, and how much is recoverable.

Download the Technical Guide
Free · PDF · ~10 min read
Simulate. Forecast. Optimize.
© 2026 Exergenics · exergenics.com