Utility incentives / LADWP
Exergenics approved utility partner
LADWP’s Business Offerings for Sustainable Solutions (BOSS) program pays $0.60 for every kWh of measured energy savings, up to the full project cost. Chilled water plants consume so much energy that, for Exergenics projects, the incentive covers the entire cost.
Exergenics forecasts your savings & incentive using historical trend data, prepares the application on your behalf and verifies the savings using IPMVP Option B to ensure you receive your rebate in full.
Approved vendor for LADWP’s Business Offerings for Sustainable Solutions (BOSS) program.
Takes 30 seconds. We’ll come back with your estimated incentive and what it means for your project.
LADWP BOSS rate, HVAC cooling
Annual kWh your plant saves × $0.60 = your incentive
$0.60 per kWh
Covers 100% of your project cost.
Source: LADWP BOSS fact sheet, May 2026
Your business case, illustrated
Project cost
Plant size
2,750 TR
Exergenics optimization at $24/TR
$66,000
Retro-commissioning, approx.
$7,500
Total project cost
$73,500
Incentive
Savings at 10% of 3,000,000 kWh
300,000 kWh a year
Calculated incentive at $0.60/kWh
$180,000
LADWP pays (100% of cost)
$73,500
Your net cost
$0
The calculated incentive of $180,000 is well above the $73,500 project cost, so LADWP covers all of it. Those 300,000 kWh then come off your bill every year.
Illustrative only. LADWP sets the final incentive from the verified savings.
BOSS pays per kWh saved, and controls and retro-commissioning measures qualify, including condenser water temperature reset. You don’t need to buy new equipment to earn it.
$0.60 per kWh of annualized energy savings, at LADWP’s HVAC cooling rate.
Up to the full project cost. On Exergenics projects, the incentive covers 100% of it.
Non-residential LADWP electric customers in good standing, for a site in LADWP’s service territory.
LADWP verifies your existing plant and pre-approves the project before any change is made.
The project must be complete within 12 months of approval.
Usually 8 to 12 weeks after LADWP’s post-installation verification. RCx projects with an estimated incentive over $150,000 are paid half at installation and half after up to 12 months of verified operation.
First come, first served while program funds last.
Exergenics builds a calibrated digital twin of your chilled water plant and finds the condenser water, chiller staging, pump and fan settings that use the least energy. Your incumbent controls contractor programs that logic into your existing BAS, where it runs on its own. No new hardware, and no live connection to us.
A 70,240-seat Los Angeles stadium improved its chilled water plant efficiency by 7.2%, measured to IPMVP Option B, with no new hardware.
5–20%
Chilled water plant energy savings
Up to 33.4%
Verified results on published projects
10–15%
Peak demand reduction
About 18 months
Average simple payback before incentives (range 6 to 24 months)
Typically $0
Net cost after the BOSS incentive
None
New hardware
Typical timing. LADWP’s review runs alongside our modeling, and nothing on your plant changes until LADWP approves the project.
01
Weeks 1 to 3, Exergenics
You send a standard trend export from your BAS. We estimate savings by strategy and size your BOSS incentive.
02
Weeks 3 to 10, you, Exergenics and LADWP
We prepare the BOSS application on your behalf and build a calibrated digital twin of your plant. LADWP verifies your baseline and pre-approves the project.
03
About 4 weeks, your controls contractor
Your incumbent controls contractor programs our Functional Description into your existing BAS.
04
At go-live, Exergenics and LADWP
We check a trend export to confirm the plant is following the new logic. LADWP completes its post-installation verification.
05
Up to 12 months, Exergenics and LADWP
We measure savings to IPMVP Option B against the calibrated baseline, and LADWP pays the incentive.
Data leaves your site as files at four points only: feasibility, modeling, verification and M&V. There is no live connection and nothing for your IT team to review.
Most likely, if you’re a non-residential LADWP electric customer in good standing with a chilled water plant. Plants with two or more chillers and at least 1,000 tons installed see the strongest results.
LADWP approves reasonable, invoiced costs to implement the measures. The incentive can’t exceed 100% of that approved cost, and incentives and grants combined can’t exceed the total project cost.
The LADWP customer, or a representative the customer authorizes in writing. Exergenics prepares the application on your behalf: the BOSS workbook, project scope and savings model.
No. The logic runs on your existing BAS, programmed by the controls contractor you already use. There is no new hardware and no live connection to Exergenics.
LADWP asks that the savings stay in place for five years, or the life of the measure if that’s shorter. If the site leaves LADWP service during that time, a prorated share of the incentive is refunded.
Tell us how to reach you. We’ll come back with your estimated incentive and the savings behind it.
Program details summarize LADWP’s BOSS fact sheet (May 2026) and terms and conditions (November 2025). LADWP sets and pays all incentives, subject to its approval, verification and available funding, and may change or end the program without notice. Savings and incentive figures on this page are estimates, not guarantees.